Fresh-checkout CI preparation
Enclosing Jujutsu change: nyntuyoo. Requirements: LTERM-RELEASE-002,
LTERM-GOV-100 and LTERM-GOV-103. M5 remains in progress; M0–M4 are unchanged.
Main CI run 38905180260
reached Clippy but failed because the demo’s frontendDist did not exist.
Local checks had passed with an existing demo build. Both version PR CI runs
also failed at this fresh-checkout prerequisite. CI now builds the demo before
Rust checks, and the README documents the same preparation. No gate is removed
and runtime contracts are unchanged.
Changesets run 38905180357 opened the signed 0.1.1 version PR #1. It remains open with auto-merge disabled. Pages run 38905180252 deployed the specification; both version PR specification builds passed. No registry packages or tags were published.
pnpm demo:build and the pinned actionlint 1.7.12 binary passed. The initial
pnpm spec:check passed seven lanes, then correctly rejected the missing mapped
governance update. Added that unchanged-contract confirmation. The repeated
spec check passed all eight lanes. Hosted full-suite qualification remains
pending the corrected push; no product code changed in this slice.